Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Catskill
Work consists of construction of a new HDPE 10" DR13.5 water main and wet well to valve vault conversion, and metering to provide a municipal water supply to the country estates mobile home park.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Borough of Chambersburg
Project consists of water main extension project. See attached file.
Posted Date
Sep 12, 2025
Due Date
Dec 9, 2025
Release: Sep 12, 2025
Borough of Chambersburg
Close: Dec 9, 2025
Project consists of water main extension project. See attached file.
AvailableTown of Jones
Work consist of 3,300 LF of 12" pvc water main, 10 LF of 6" PVC water main, 1,410 LF of directional bore & install 12" water main, 35 LF of directional bore & install 6" water main, 8 EA of PVC to pe transition, 55 LF of bore & install 18" steel casing, 450 LF of slick bore, 88 SY of gravel repair, 6 SY of remove & repair concrete, 1 EA of 12" interconnection, 10 EA of 12" gate valve & box, 2,200 SY of solid slab sodding, 7 EA of 6" fire hydrant assembly, 3 EA of 2" air/vacuum release valve. See attached file.
Posted Date
-
Due Date
Nov 20, 2025
Release: -
Town of Jones
Close: Nov 20, 2025
Work consist of 3,300 LF of 12" pvc water main, 10 LF of 6" PVC water main, 1,410 LF of directional bore & install 12" water main, 35 LF of directional bore & install 6" water main, 8 EA of PVC to pe transition, 55 LF of bore & install 18" steel casing, 450 LF of slick bore, 88 SY of gravel repair, 6 SY of remove & repair concrete, 1 EA of 12" interconnection, 10 EA of 12" gate valve & box, 2,200 SY of solid slab sodding, 7 EA of 6" fire hydrant assembly, 3 EA of 2" air/vacuum release valve. See attached file.
AvailableGilbert-Summit Rural Community Water District
6,050 LF - C-900 PVC water main, 8"; 2,577 LF - C-900 PVC water main, 6"; 1 ea - tee, 6"x6" MJ; 5 ea - gate valves W/bos, 8" MJ; 22 ea - service connection, open cut; 1 ea - connect new water main to existing (includes material & labor); 80 LF - steel casing, 12".
Posted Date
Oct 27, 2025
Due Date
Nov 27, 2025
Release: Oct 27, 2025
Gilbert-Summit Rural Community Water District
Close: Nov 27, 2025
6,050 LF - C-900 PVC water main, 8"; 2,577 LF - C-900 PVC water main, 6"; 1 ea - tee, 6"x6" MJ; 5 ea - gate valves W/bos, 8" MJ; 22 ea - service connection, open cut; 1 ea - connect new water main to existing (includes material & labor); 80 LF - steel casing, 12".
AvailableCalvert County
Project consist of 12" LF, furnish and install PVC restrained joint water main; 12" LF, furnish and install directionally drilled pipeline; furnish and install air release valve; 20 CY, contingent unclassified excavation; 20 TN, contingent porous fill #57 stone; 20 TN, contingent CR-6 (crusher run) graded aggregate; 10 CY, contingent miscellaneous concrete; 10 TN, contingent hotmix asphalt pavement; 50 CY, contingent off-site borrow. See attached files and outside link.
Posted Date
Aug 15, 2025
Due Date
Nov 20, 2025
Release: Aug 15, 2025
Calvert County
Close: Nov 20, 2025
Project consist of 12" LF, furnish and install PVC restrained joint water main; 12" LF, furnish and install directionally drilled pipeline; furnish and install air release valve; 20 CY, contingent unclassified excavation; 20 TN, contingent porous fill #57 stone; 20 TN, contingent CR-6 (crusher run) graded aggregate; 10 CY, contingent miscellaneous concrete; 10 TN, contingent hotmix asphalt pavement; 50 CY, contingent off-site borrow. See attached files and outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis