CityOH
Posted
Nov 7, 2026
Dec 16, 2026
East Substation - Power Transformer RFP
East Substation - Power Transformer.
Description: Pursuant to Section 143-129 of the General Statutes of North Carolina, sealed proposals for furnishing a Power Transformer for the Cotton Grove Substation for the City of Lexington Electric Department will be received on or before 1:00 p.m. EST, Friday, December 18, 2026 in the Council Chambers at the City of Lexington City Centre, 200 North State Street, Lexington, NC 27292, at which time and place the proposals will be publicly opened and read. Bidders will be required to comply with all applicable statutes and regulations and those attached to and made a part of the proposal. Specifications may be obtained at the office of the City's Engineer, Southeastern Consulting Engineers, Inc., Jeremy Furr - jeremy@scepower.com, P. O. Box 240436, Charlotte, North Carolina 28224, Monday-Friday 9:00am-4:00pm (704) 523-6045 . The City of Lexington encourages the participation of minority and historically underutilized business enterprises. The City of Lexington, North Carolina reserves the right to reject any and/or all proposals.
City · NC, US
Adjacent opportunities open for bidding right now.
CityOH
Posted
Nov 7, 2026
Dec 16, 2026
East Substation - Power Transformer.
CityFL
Posted
Oct 14, 2026
Dec 9, 2026
The Project includes a qualified manufacturer providing the labor, material, equipment, and services necessary to manufacture, deliver, set, assemble and test one (1) substation step-down power Transformer T2 (22.4 MVA 69/12.47kV).
Monroe County Electric Power Association
Special DistrictMS
Posted
Nov 10, 2026
Dec 16, 2026
The work consists of furnishing, delivering, assembling, testing, and certifying one 161/25 kV, 12/16/20//22.4 MVA substation power transformer for the Elliott Substation.
Special DistrictMN
Posted
Oct 13, 2026
Nov 23, 2026
Project consists of the equipment and materials necessary to supply ONE (1) substation power transformer and place on foundations at the Zumbro River Substation in Rochester MN. The work shall consist of, but is not limited to, the following: Design, manufacture, test one unit as specified Transportation from factory to project site. Unload and set transformer on Owner-provided foundation. Optional field services to assemble and test the power transformer.
Decision makers connected to this RFP from City of Lexington.
Solicitation files and supporting documents for this bid.