Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of riser pipes at a corrections center.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of existing 36" steel casing, spray foam insulation, and 30" HDPE pipe with new 24" restrained ductile iron pipe, wax tape, 5" thick Foamglas insulation, and heavy duty protective UV resistant outerwrap across the Provo River utility bridge.
Posted Date
Dec 16, 2025
Due Date
Jan 12, 2026
Release: Dec 16, 2025
Close: Jan 12, 2026
Replacement of existing 36" steel casing, spray foam insulation, and 30" HDPE pipe with new 24" restrained ductile iron pipe, wax tape, 5" thick Foamglas insulation, and heavy duty protective UV resistant outerwrap across the Provo River utility bridge.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Fire Riser Relocation.
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Close: Jan 15, 2026
Fire Riser Relocation.
AvailableRelease: Dec 18, 2025
Close: Jan 22, 2026
Corrections center inmate shower remodel.
AvailableTarrant Regional Water District seeks a vendor to provide a 110-ton hydraulic track crawler crane with operator and rigging to support the Richland Chambers Pipeline Replacement Project. The work includes lifting and placing heavy 72-inch pre‑stressed pipe segments weighing up to 50,000 lbs with an estimated lift of 20–25 feet, with project activity tentatively scheduled from mid‑February through March 2026. Bids are due January 22, 2026 at 2:00 PM Central Time, with questions due January 15, 2026 at 5:00 PM Central Time.
Posted Date
Jan 8, 2026
Due Date
Jan 22, 2026
Release: Jan 8, 2026
Close: Jan 22, 2026
Tarrant Regional Water District seeks a vendor to provide a 110-ton hydraulic track crawler crane with operator and rigging to support the Richland Chambers Pipeline Replacement Project. The work includes lifting and placing heavy 72-inch pre‑stressed pipe segments weighing up to 50,000 lbs with an estimated lift of 20–25 feet, with project activity tentatively scheduled from mid‑February through March 2026. Bids are due January 22, 2026 at 2:00 PM Central Time, with questions due January 15, 2026 at 5:00 PM Central Time.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →