Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace cooling tower and exterior piping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Furnish and install a 1,000 ton cooling tower along with associated pump and piping to replace the existing cooling tower.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close: Jan 22, 2026
Furnish and install a 1,000 ton cooling tower along with associated pump and piping to replace the existing cooling tower.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of a cooling tower.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Replacement of a cooling tower.
AvailableReplacement of the cooling tower at the Law Enforcement Center and the installation of a new chilled water cooling coil in the air handling unit (AHU).
Posted Date
Dec 2, 2025
Due Date
Jan 30, 2026
Release: Dec 2, 2025
Close: Jan 30, 2026
Replacement of the cooling tower at the Law Enforcement Center and the installation of a new chilled water cooling coil in the air handling unit (AHU).
AvailableDESIGN-BID-BUILD - construction of an approx. 17,135SF one story new chilled water district cooling plant (DCP). The DCP will be an unoccupied one-story building. The exterior facade is to be pre-cast panels. Construction option of a new parking area to replace existing parking that will be lost due to the boundaries of the new building.
Posted Date
Nov 18, 2025
Due Date
Jan 15, 2026
Release: Nov 18, 2025
Close: Jan 15, 2026
DESIGN-BID-BUILD - construction of an approx. 17,135SF one story new chilled water district cooling plant (DCP). The DCP will be an unoccupied one-story building. The exterior facade is to be pre-cast panels. Construction option of a new parking area to replace existing parking that will be lost due to the boundaries of the new building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →