Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for repair and replacement of bridge deck expansion joints and concrete/asphalt deck repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes Replace the existing bridge deck. Additional rehabilitation work at the bridges includes replacement of the expansion joints and bearings; miscellaneous patching of the substructure, composite fiber wrap of pier columns, sealing of all construction joints; performing concrete weatherproofing; maintenance of traffic; painting of structural steel; and all other items incidental to the completion of the Work.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Project includes Replace the existing bridge deck. Additional rehabilitation work at the bridges includes replacement of the expansion joints and bearings; miscellaneous patching of the substructure, composite fiber wrap of pier columns, sealing of all construction joints; performing concrete weatherproofing; maintenance of traffic; painting of structural steel; and all other items incidental to the completion of the Work.
AvailableBridge rehabilitation including epoxy overlay, deck patching, hot mix asphalt wearing surface replacement, deck patching, resealing deck joints silane treatment of bridge facias, repairing post- tensioning pockets, clearing, abutment crack injection repairs, bridge sidewalk repairs and approach work. See attached file.
Posted Date
Dec 5, 2025
Due Date
Feb 6, 2026
Release: Dec 5, 2025
Close: Feb 6, 2026
Bridge rehabilitation including epoxy overlay, deck patching, hot mix asphalt wearing surface replacement, deck patching, resealing deck joints silane treatment of bridge facias, repairing post- tensioning pockets, clearing, abutment crack injection repairs, bridge sidewalk repairs and approach work. See attached file.
AvailableThe City of Bellevue seeks contractors to replace failed compression seal expansion joints, perform bridge deck assessment and repairs, and apply a high molecular weight methacrylate or thin polymer overlay, including related traffic control that may require lane or bridge closures. This contract is partially funded by the Federal Highway Administration and must comply with Federal Aid Construction provisions including Build America Buy America and an FSBE goal of 10%. Bids are due by delivery to the City’s bid drop box on the first floor of Bellevue City Hall by 10:00 AM on February 26, 2026.
Posted Date
-
Due Date
Feb 26, 2026
Release: -
Close: Feb 26, 2026
The City of Bellevue seeks contractors to replace failed compression seal expansion joints, perform bridge deck assessment and repairs, and apply a high molecular weight methacrylate or thin polymer overlay, including related traffic control that may require lane or bridge closures. This contract is partially funded by the Federal Highway Administration and must comply with Federal Aid Construction provisions including Build America Buy America and an FSBE goal of 10%. Bids are due by delivery to the City’s bid drop box on the first floor of Bellevue City Hall by 10:00 AM on February 26, 2026.
AvailableBridge deck repairs.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Bridge deck repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis