Mississippi Department of Transportation
State AgencyMS
Posted
Nov 2, 2026
Nov 24, 2026
I-55 from Church Road to Heindl Road - OGFC Lift RFP
Work includes 1,440 SY removal of asphalt paved shoulders, all depths, 76 SY removal of asphalt pavement, failed areas, 147 SY removal of concrete paved ditch, 6,390 LF removal of guard rail, including rails, posts and terminal ends, 363 LF removal of joint material, 7,590 LF removal of traffic stripe, 620 LF removal of debris from drainage channel 334 CY excess excavation, fm, ah, 2,840 SY geotextile stabilization, type v, non-woven, 3 CY concrete paved ditch, 541 Ton granular material, crushed stone, 318,050 SY fine milling of bituminous pavement, all depths, 101 LF saw cut, full depth, 4,765 LF guard rail, class a, type 1, 'w' beam, metal post. See attached file.
