Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project scope consists of the construction of an elevated water storage tank with mixing system built to a capacity of 300,000 gallons, including all foundation work, valving, piping, and appurtenances within the tank bowl and base of the tank to be installed. Work shall also include; site work around the base of the tank, new concrete pavement, access driveway, fencing & gates, electrical work, SCADA integration, earthwork, approximately 240 LF of 12" water main connecting the base of the tower to the existing water main in SR 534, swale grading on the northern end of the site for drainage, site re-grading for access driveway and tank enclosure area, and new access driveway storm culvert.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes Contract A - Elevated Storage Tank Work (Lump Sum). Work for Contract A consists of construction of a 500,000-gallon single pedestal spheroid elevated storage tank, site work, and associated work.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Project includes Contract A - Elevated Storage Tank Work (Lump Sum). Work for Contract A consists of construction of a 500,000-gallon single pedestal spheroid elevated storage tank, site work, and associated work.
AvailableWork includes approx. 3500 SY of Turf Establishment; 1,100 LBS of Water Main Fitting; 45 LF of 6" PVC Water Main hydrant Lead; 1,1120 LF of 12" PVC Water Main Installed by Trenching; 140 LF of 12" HDPE Water Main Installed by Directional Drilling. See outside link.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Work includes approx. 3500 SY of Turf Establishment; 1,100 LBS of Water Main Fitting; 45 LF of 6" PVC Water Main hydrant Lead; 1,1120 LF of 12" PVC Water Main Installed by Trenching; 140 LF of 12" HDPE Water Main Installed by Directional Drilling. See outside link.
AvailableContract 1, Elevated Water Storage Tank involves replacing the existing water storage tank that serves the western end of Elkin, the eastern part of Wilkes County, and the Town of Ronda with a 500,000-gallon elevated spheroidal water storage tank and appurtenances.
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Close: Jan 15, 2026
Contract 1, Elevated Water Storage Tank involves replacing the existing water storage tank that serves the western end of Elkin, the eastern part of Wilkes County, and the Town of Ronda with a 500,000-gallon elevated spheroidal water storage tank and appurtenances.
AvailableThe Cape Fear Public Utility Authority is soliciting bids for the River Road Booster Pump Station & Waterline Interconnect project, which involves construction of a water booster pump station and installation of a waterline interconnect including pipe installation, fittings, valves, and erosion/sediment control. The procurement is an Invitation for Bid with a total base bid range reported on the aggregator between approximately $4,405,925.00 and $5,700,000.00 and an AI-estimated budget of $4,000,000 – $6,000,000. Contractors are required to submit a lump sum bid with unit price items and allowances and to follow documentation available from the buyer site linked from the aggregator.
Posted Date
Dec 4, 2025
Due Date
Jan 4, 2026
Release: Dec 4, 2025
Close: Jan 4, 2026
The Cape Fear Public Utility Authority is soliciting bids for the River Road Booster Pump Station & Waterline Interconnect project, which involves construction of a water booster pump station and installation of a waterline interconnect including pipe installation, fittings, valves, and erosion/sediment control. The procurement is an Invitation for Bid with a total base bid range reported on the aggregator between approximately $4,405,925.00 and $5,700,000.00 and an AI-estimated budget of $4,000,000 – $6,000,000. Contractors are required to submit a lump sum bid with unit price items and allowances and to follow documentation available from the buyer site linked from the aggregator.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis