Retrieving RFP details
Release
Close
City of Algood
Installation of approximately 4,300 LF of 12" ductile iron water main replacing existing main, including graded stone and paving replacement, service line and meter installations as well as all necessary appurtenances to provide a complete water line per the plans and specifications.
ADV-For-BID-Algood-C-125-Main-Street-WLR
Borough of Mount Joy
Water main replacement. Including 35 LF of 12" Ductile iron pipe; 1,640 LF of 8" Ductile iron pipe; 760 LF of 6" Ductile iron pipe; 75 LF bore and jack railroad crossing (solid); 30 ea ductile iron fitting; 5 ea fire hydrant assembly; 19 ea water service reconnect; 350 LF type K copper tubing; 100 LF curb and sidewalk restoration; 1,670 SY trench restoration permanent pavement; 3,400 SY mill and overlay permanent pavement; 250 CY miscellaneous rock excavation (contigency item); 75 LF bore and jack railroad crossing (contingency item rock);
Winterport Water District
Work under this project includes, approx. 320 LF of 8 and 6" DI water mains via open-cut, 30 LF of water services, one hydrant assembly with wedge valve, 4 EA 8" valves, bituminous trench pavement, indeterminate ledge removal, and all site work, test pits, earthwork, erosion control, traffic control, restoration of disturbed areas, loam and seeding, and all incidentals as required for a complete project.
City of Chino Hills
Work consists Installation of a new 12" PVC C900 DR 14 water main and all associated tasks including trenching; new fire hydrant installation; new water service lateral installation; removal of interfering portions of existing water main infrastructure; backfill and compaction; flushing, disinfection, and testing; asphalt reconstruction; sidewalk and driveway construction; fence and gate replacement; private property restoration; striping restoration; monument preservation.
Release
Oct 24, 2025
Close
Nov 20, 2025