Summary
Project includes the replacement of approx 1,700 LF of existing 8" cast iron water main with a 10" pvc water main along east street, including installation of valves, fittings, hydrants, service connections up to and including the curb stop, and all associated appurtenances. Work also includes connection to existing water mains, abandonment of the existing water main, and flushing, testing, and disinfection of the new main. Additional work includes pavement and subbase removal and replacement, restoration of all disturbed surfaces to match existing grades, and milling and overlay. The project also includes maintenance and protection of traffic, protection of existing utilities, coordination with utility companies, site restoration, and preparation of record drawings.