Construction upgrades are proposed at the town's wastewater treatment facility (WWTF) and four lift stations: lift stations no. 3, no. 5, no. 6, and no. 7. At the WWTF, a new sludge pumping building and sludge storage tank are proposed. Electrical infrastructure, including service, generator, MCCS, control wiring, and control panels will be replaced and upgraded. Disc aerators for the oxidation ditch will be fully replaced. Concrete for the influent screening channel will be rehabilitated. A screening vault will be added for the existing aerobic digester. Buried utility upgrades and site improvements are required to complete the upgrades. For the lift stations, upgrades are focused on improving emergency services and operations. At lift station no. 5, a portable generator receptacle will be added to the existing station. At lift stations no. 3, no. 6, and no. 7, permanent generators and propane tanks will be added to serve the existing stations. Process piping and site improvements are required at these lift stations to complete the upgrades.