Construction Services for Cahoon Road Force Main Replacement Project RFP
Work includes new 10" PVC force main and 12" HDPE directional bore crossing within service territory.
Description: Construction services for the Cleveland Road Force Main Replacement project in Jacksonville, Florida.
SpecialDistrict · FL, US
Adjacent opportunities open for bidding right now.
Special DistrictFL
Posted
-
Dec 1, 2026
Work includes new 10" PVC force main and 12" HDPE directional bore crossing within service territory.
CityFL
Posted
Oct 23, 2026
Nov 23, 2026
Construction of the force main consists of installation of approx 3,600 LF of various size force main piping installed via open cut, horizontal directional bore, and jack and bore. Installation of the force main will begin at the capped terminus of the recently-constructed Western Sewer Force Main Phase 1 Project. Work for this project will include but is not limited to the following: installation of 12" PVC, 16" PVC, 24" PVC, 30" PVC, 36" PVC, and 36" force main, fittings, valves, connections, asphalt and sidewalk removal and replacement restoration, clearing and grubbing as needed, restoration of site landscaping, irrigation, roadway, other affected facilities, and necessary maintenance of traffic.
Brick Township Municipal Utilities Authority
Special DistrictNJ
Posted
Oct 26, 2026
Dec 2, 2026
Replacement of existing twelve (12”) inch and sixteen (16”) inch diameter water main segments within the established franchise area with no planned increase in the Authority's existing water allocation permit. Replacement of these water mains will utilize horizontal directional drilling (HDD) techniques in order to harden the existing distribution system with minimal impact to the physical environment.
CountyOH
Posted
Oct 30, 2026
Dec 2, 2026
The work covered by the plans and specifications includes: Construction of a new submersible pump station and 12” force main at the existing Center Road Pump Station facility and along the existing route of the Center Road Force Main. Work also includes abandonment of various facilities and sewers and installation of gravity lines to transfer flow from existing sewers into the new pump station.
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
The capital-project schedule lists an LDP Program for Ductile Iron Force Main Replacement with multi-year budget figures of 1,172, 1,500, 1,540, 3,000 and 3,000.
Water Project Title FY26 Proposed ('000) FY27 Proposed ('000) FY28 Proposed ('000) FY29 Proposed ('000) FY30 Proposed ('000) FY26-FY30 Total ('000) JP - COJ -- Old Middleburg Rd - Hazel Lake Drive to Argyle Forest Blvd - New -- Force Main 2,595 1,711 0 0 0 4,305 Estuary - 2023-0673 Ranger Station Roadway and Infrastructure - Reclaim 2,563 0 0 0 0 2,563 Main…
Jea Board of Directors Workshop
Agenda packet · Jun 4, 2025
Board meeting
JEA’s FY27 proposed capital program lists Cleveland Ave Force Main Crossing Replacement at $2.093 million.
5/29/2026 WaterSewer FY27-FY31 Water Project Title FY27 Proposed ('000) FY28 Proposed ('000) FY29 Proposed ('000) FY30 Proposed ('000) FY31 Proposed ('000) FY27-FY31 Total ('000) Ponte Vedra Water Reclamation Facility - Improvements 11,462 14,519 7,057 0 0 33,038 RiverTown - New Storage and Pumping System - Reclaim 10,254 3,846 0 0 0 14,100 JP - SJC -…
RFP published
Proposals due (33 days left)
Jea Board Of Directors Workshop
Board meeting · Jun 9, 2026
Cleveland Ave - Force Main Crossing Replacement 2,093 0 0 0 0 2,093
Jea Board Of Directors Board Of Directors Meeting And Rate Hearing
Agenda packet · Jun 30, 2026
Decision makers connected to this RFP from JEA.