Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Corpus Christi
Construction of wastewater treatment plant office
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Henrietta
Work includes : construction of 0.850 mgd wastewater treatment plant, including raw wastewater lift station, aeration basin, clarifiers, sludge drying beds, chlorine contact basin, yard piping and miscellaneous site work.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
City of Henrietta
Close: Dec 16, 2025
Work includes : construction of 0.850 mgd wastewater treatment plant, including raw wastewater lift station, aeration basin, clarifiers, sludge drying beds, chlorine contact basin, yard piping and miscellaneous site work.
AvailableAlbany Port District
Construction of both a packaged wastewater treatment plant and fire pump house (2-part bid).
Posted Date
Oct 20, 2025
Due Date
Dec 18, 2025
Release: Oct 20, 2025
Albany Port District
Close: Dec 18, 2025
Construction of both a packaged wastewater treatment plant and fire pump house (2-part bid).
AvailableTown of Alma
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
Posted Date
Oct 31, 2025
Due Date
Dec 19, 2025
Release: Oct 31, 2025
Town of Alma
Close: Dec 19, 2025
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
AvailableDefiance County
The project includes the construction of a 15,000 GPD precast packaged wastewater treatment plant. It also includes the construction of a pole building over the wastewater treatment plant, ventilation, electrical work, piping and sitwork. The existing wastewater treatment plant and buiilding shall be demolished after the new plant is operational.
Posted Date
Nov 2, 2025
Due Date
Dec 2, 2025
Release: Nov 2, 2025
Defiance County
Close: Dec 2, 2025
The project includes the construction of a 15,000 GPD precast packaged wastewater treatment plant. It also includes the construction of a pole building over the wastewater treatment plant, ventilation, electrical work, piping and sitwork. The existing wastewater treatment plant and buiilding shall be demolished after the new plant is operational.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis