CityNY
Posted
Oct 7, 2026
Oct 20, 2026
Rano Blvd. Booster Station Electrical Service RFP
Booster station electrical service.
Description: Project includes demolition of the existing hydropneumatic tank, installation of a new hydropneumatic tank and foundation, installation of booster pumps, piping and valves, and electrical improvements including new motor control and power distribution equipment. Work consists of replacement of the existing hydropneumatic tank, booster pumps, piping, valves, motor control center, and associated electrical and control facilities.
SpecialDistrict · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityNY
Posted
Oct 7, 2026
Oct 20, 2026
Booster station electrical service.
Southwest Delaware County Municipal (Sewer) Authority
Special DistrictPA
Posted
Dec 18, 2024
Nov 17, 2026
Work includes electrical upgrades and scada upgrades at the swdcma administration building and pump stations. Contractor shall perform upgrades to the pump station by supplying equipment, materials, and labor to replace the existing pump control panel and vfds with new upgraded equipment including but not limited to a new vfd and harmonic filter, and to install a scada and scada panel in pump station including administration building hardware and administration integration/programming. Work also includes miscellaneous demolition, wet well lighting, mobilization and demobilization, insurance and bonding, and permits. See attached file.
Special DistrictCA
Posted
Sep 1, 2026
Nov 13, 2026
Procurement of construction services for Northridge Well Phase 2, including the equipping of Well #15 and associated site improvements, such as pump installation, piping, chlorination system, building construction, site grading, and electrical systems.
Rampart Range Metropolitan District 1
Special DistrictCO
Posted
Sep 25, 2026
Nov 18, 2026
Work includes installation and maintenance of erosion control best management practices (bmps), traffic control, earthwork, curb & gutter, hot mix asphalt pavement, security fencing, approximately 9,000 linear feet of electrical conduit and fiber optic cable, unit masonry building, emergency power generator, water booster pump station electrical and controls, five pumps controlled by variable frequency drives, two surge tanks, ductile iron piping, valves, and cathodic protection for pipelines.