Retrieving RFP details
Release
Close
National Guard Bureau (NGB)
Construction of Grade Separated U-Turns at Milepost 6.40 and 19.00.
City of Saint Louis
Tornado Recovery Vacant Unit Turns Program NOFA.
Ohio Turnpike and Infrastructure Commision
Work includes: Removal by milling of two (2) inches of existing asphalt pavement in the right, center, and left lanes of the mainline, removal by milling of two (2) inches of existing asphalt in the left and right shoulder, mill and fill of the Sonic Nap Alert Pattern in the left and right shoulder, resurfacing of the pavement and shoulders to the thickness specified in the drawings, installation of raised pavement markers and permanent pavement striping and/or other pavement markings, upgrading of guardrail, installation of SNAPs, and temporary traffic control. See attached file.
Pennsylvania Turnpike Commission - Purchasing
Work includes 29,023 SF of high strength fiber wrap; 600 SF of concrete bridge deck repair type 3; 2,505 SF of concrete bridge deck repair accelerated, type 2 using asc; 2,640 SY of scarification, 1/2" depth; 10,210 SY of epoxy overlay; 1,320 SY of latex modified concrete wearing surface, 1 1/4" depth; 46 CY of latex modified concrete, variable depth; 2,101 SF of class aa cement concrete repairs; 624 LF of neoprene strip seal gland replacement; 427 SF of prestressed concrete beam repairs; 120 LF of emseal expansion joint seal; 200 LF of precast concrete median barrier, structure mounted.
Release
-
Close
Nov 20, 2025