Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Cape Fear Public Utility Authority
Project consists of construction of a new booster pump station with piping, pumps, building, electrical, etc. As well as a new transmission pipeline to tie into the existing system.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Chester Water Authority
Upgrade of potable water booster pumps, valves, controls, generator, interior piping, building improvements as well as site improvements to an existing booster pump station. Includes bypass pumping during the project.
Posted Date
Oct 16, 2025
Due Date
Nov 20, 2025
Release: Oct 16, 2025
Chester Water Authority
Close: Nov 20, 2025
Upgrade of potable water booster pumps, valves, controls, generator, interior piping, building improvements as well as site improvements to an existing booster pump station. Includes bypass pumping during the project.
AvailableLauderdale County
The Project consists of a new elevated water tower, booster pump station and associated water main piping.
Posted Date
Oct 21, 2025
Due Date
Nov 18, 2025
Release: Oct 21, 2025
Lauderdale County
Close: Nov 18, 2025
The Project consists of a new elevated water tower, booster pump station and associated water main piping.
AvailableCity of Ogdensburg
Wastewater pump station rehabilitation - electrical construction.
Posted Date
Oct 30, 2025
Due Date
Dec 2, 2025
Release: Oct 30, 2025
City of Ogdensburg
Close: Dec 2, 2025
Wastewater pump station rehabilitation - electrical construction.
AvailableEdgecombe County
The project includes the following work: 1. replace booster pump station building w/ associated piping. 2. permanent back-up generator. 3. SCADA. 4. (3) skid mounted booster pumps. 5. chemical feed system. 6. (2) 16 x 16 x 12-inch tapping sleeves with 12-inch valves. 7. earthwork. 8. 12 FT gravel drive.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Edgecombe County
Close: Dec 16, 2025
The project includes the following work: 1. replace booster pump station building w/ associated piping. 2. permanent back-up generator. 3. SCADA. 4. (3) skid mounted booster pumps. 5. chemical feed system. 6. (2) 16 x 16 x 12-inch tapping sleeves with 12-inch valves. 7. earthwork. 8. 12 FT gravel drive.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis