Summary
7 EA of 8-inch (8") POINT REPAIR (using 8" (8") SDR 26 PVC, including adapters to connect to existing pipe) by excavation, all depths, replacing 6-feet (6') of pipe for each repair, including excavation; trench safety; groundwater control; sewer flow control (including by-pass pumping, if required); installation; bedding; removal of old pipe; reconnecting service leads to sewer line (as applicable); testing; backfill and compaction testing; pre- and post-
construction cleaning and televising; removal and replacement of sprinkler systems and other above ground obstructions per
Attachment A of the Contract; and site restoration (includes
removal and replacement of fencing, sod, driveways, sidewalk,
etc. as needed, but not including street pavement removal and
replacement); complete in place, as directed by the Engineer. 1 EA of 15-inch (15") POINT REPAIR (using 15-inch (15") SDR 26 PVC, including adapters to connect to existing pipe) by excavation, all depths, replacing 6-feet (6') of pipe for each repair, including excavation; trench safety; groundwater control; sewer flow control (including by-pass pumping, if required); installation; bedding; removal of old pipe; reconnecting service leads to sewer line (as applicable); testing; backfill and compaction testing; pre-and post-construction cleaning and televising; removal and
replacement of sprinkler systems and other above ground obstructions per Attachment A of the Contract; and site restoration (includes removal and replacement of fencing, sod, driveways, sidewalk, etc. as needed, but not including street pavement removal and replacement); complete in place, as directed by the Engineer.