Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes excavation, hot mix asphalt, (st) (9. 5mm) base repair, maintenance of traffic, 4" wide thermoplastic traffic stripe (skip yellow) ( 120 mils ), reflectorized traffic warning sign (encapsulated lens), 4" wide cold plastic edge stripe (continuous white).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for construction services for resealing 16.640 miles of roads in Itawamba County, Mississippi.
Posted Date
Jan 15, 2026
Due Date
Feb 13, 2026
Release: Jan 15, 2026
Close: Feb 13, 2026
This RFP is for construction services for resealing 16.640 miles of roads in Itawamba County, Mississippi.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the resealing of 29.281 miles of roads in Smith County, Mississippi.
Posted Date
-
Due Date
Feb 20, 2026
Close: Feb 20, 2026
Procurement for the resealing of 29.281 miles of roads in Smith County, Mississippi.
AvailableWork includes unclassified excavation (fm) 46.000 CY, hot mix asphalt, (st) (12.5mm)(edge repair) 18.000 Ton, hot mix asphalt, (st) (19 mm) (base repair) 92.000 Ton, hot mix asphalt, (st) (9.5 mm), leveling 258.000 Ton, emulsified asphalt, grade crs-2p 10,293.000 Gal, seal aggregate cover material, size 7, crushed stone 254.000 CY, blotter material 36.000 CY, maintenance of traffic, additional construction signs, 4" wide thermoplastic edge stripe (continuous white) ( 60 mil ) 3.477 MI, 4" wide thermoplastic traffic stripe (skip yellow) (90 mil) 0.454 MI. See attached file.
Posted Date
Jan 6, 2026
Due Date
Mar 2, 2026
Release: Jan 6, 2026
Close: Mar 2, 2026
Work includes unclassified excavation (fm) 46.000 CY, hot mix asphalt, (st) (12.5mm)(edge repair) 18.000 Ton, hot mix asphalt, (st) (19 mm) (base repair) 92.000 Ton, hot mix asphalt, (st) (9.5 mm), leveling 258.000 Ton, emulsified asphalt, grade crs-2p 10,293.000 Gal, seal aggregate cover material, size 7, crushed stone 254.000 CY, blotter material 36.000 CY, maintenance of traffic, additional construction signs, 4" wide thermoplastic edge stripe (continuous white) ( 60 mil ) 3.477 MI, 4" wide thermoplastic traffic stripe (skip yellow) (90 mil) 0.454 MI. See attached file.
AvailableThe Board of Supervisors of Covington County, Mississippi issued a solicitation for construction of 1.761 miles of roadway (State Aid Program Project No. SAP-16(25)S) on Old Hwy 84 - Leaf River Church in Covington County. Bids are to be submitted as sealed bids and will be accepted until 10:00 a.m. on March 2, 2026 at the Chancery Building in Collins, Mississippi; bidders must provide a certified check or bid bond equal to five percent (5%) of the total bid. The work includes asphalt repairs, emulsified asphalt, aggregate cover material, traffic control, thermoplastic striping and other roadway items; period of performance is 20 working days.
Posted Date
Jan 20, 2026
Due Date
Mar 2, 2026
Release: Jan 20, 2026
Close: Mar 2, 2026
The Board of Supervisors of Covington County, Mississippi issued a solicitation for construction of 1.761 miles of roadway (State Aid Program Project No. SAP-16(25)S) on Old Hwy 84 - Leaf River Church in Covington County. Bids are to be submitted as sealed bids and will be accepted until 10:00 a.m. on March 2, 2026 at the Chancery Building in Collins, Mississippi; bidders must provide a certified check or bid bond equal to five percent (5%) of the total bid. The work includes asphalt repairs, emulsified asphalt, aggregate cover material, traffic control, thermoplastic striping and other roadway items; period of performance is 20 working days.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →