CountyMS
Posted
Nov 9, 2026
Dec 9, 2026
Construction of 0.180 Miles of Bridge Repair and Approaches RFP
Work inlcudes 2 EA removal of concrete headwall; 144 LF removal of pipe (all types)(all sizes); 650 SY remove and relay riprap; 1,700 CY unclassified excavation (pm); 5,400 CY excess excavation (lvm); 280 TN crushed stone (size 610); 15 TN hot mix asphalt, st, 12.5mm (base repairs); 155 TN hot mix asphalt, st, 9.5mm (surface); 155 TN hot mix asphalt, st, 9.5mm (leveling); 100 SY cold milling of bituminous pavement (all depths).
