Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the construction of 11 bridge replacements on US 80 at KCS Railroad in Rankin County.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
Posted Date
Oct 6, 2025
Due Date
Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 27, 2026
Work includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
AvailableRelease: -
Close: Jan 29, 2026
Bridge project
AvailableWork includes 1,477 SY transverse grooving, 2,005 LF 30" steel pipe piling, wall thickness 0. 500", 1,880 LF 20" steel pipe piling, wall thickness 0.500", 1,193 LF 80' prestressed concrete beam, type fib-36 995 LF prestressed concrete beam, type fib-36, 137,144 pounds reinforcement, 5,191 pounds reinforcement, corrosion resistant, 886 LF concrete railing, 36", 698 ton loose riprap, size 300, 644 SY geotextile under riprap, 463 CY bridge concrete, class bdx, 149 CY bridge concrete, class aa 98 LF preformed joint seal, type i, 1,104 ton 9. 5-mm, st, asphalt pavement. See attached file.
Posted Date
Oct 6, 2025
Due Date
Jan 27, 2026
Release: Oct 6, 2025
Close: Jan 27, 2026
Work includes 1,477 SY transverse grooving, 2,005 LF 30" steel pipe piling, wall thickness 0. 500", 1,880 LF 20" steel pipe piling, wall thickness 0.500", 1,193 LF 80' prestressed concrete beam, type fib-36 995 LF prestressed concrete beam, type fib-36, 137,144 pounds reinforcement, 5,191 pounds reinforcement, corrosion resistant, 886 LF concrete railing, 36", 698 ton loose riprap, size 300, 644 SY geotextile under riprap, 463 CY bridge concrete, class bdx, 149 CY bridge concrete, class aa 98 LF preformed joint seal, type i, 1,104 ton 9. 5-mm, st, asphalt pavement. See attached file.
AvailableProvide Construction Manager at Risk – Keystone Bridge Project.
Posted Date
Jan 5, 2026
Due Date
Feb 12, 2026
Release: Jan 5, 2026
Close: Feb 12, 2026
Provide Construction Manager at Risk – Keystone Bridge Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →