Summary
Work includes 1 EA l-853 elevated retroreflective markers with concrete pad, installed; 4 EA existing base mounted edge light, removed with base to remain and steel cover installed; 1 LS temporary airfield lighting; 1 LS contractor quality control program (cqcp) ; 1 LS temporary erosion control; 300 SY asphalt pavement removal and disposal ; 240 SF pavement markings removal; 27,700 SY cold milling (2" depth); 9,820 SY cold milling (3" depth) ; 4,780 tn asphalt surface course; 1,100 SF taxiway marking (reflective); 1,500 sf taxiway marking (non-reflective); 1,100 SF taxiway marking (temporary). See outside link.