Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction and installation for the replacement of water main(s).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of a new replacement water line for a portion of an existing 10" cast iron water distribution main. The replacement line will be 12" and approx. 4,100 LF in length. Landscape areas, curb and gutter, asphalt, and other items to be restored to pre-construction conditions.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
Installation of a new replacement water line for a portion of an existing 10" cast iron water distribution main. The replacement line will be 12" and approx. 4,100 LF in length. Landscape areas, curb and gutter, asphalt, and other items to be restored to pre-construction conditions.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableInstallation of over 600 LF of 6" diameter Class 50 ductile iron water main complete with the installation of new gate valves, permanent blow off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the installation of a fire hydrant assembly, reconnection of five water services with pressure reducing valves, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, tree removal, rock excavation, and the removal and replacement of existing fences, landscaping, and gravel surfaces.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
Installation of over 600 LF of 6" diameter Class 50 ductile iron water main complete with the installation of new gate valves, permanent blow off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the installation of a fire hydrant assembly, reconnection of five water services with pressure reducing valves, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, tree removal, rock excavation, and the removal and replacement of existing fences, landscaping, and gravel surfaces.
AvailableWater main replacement. This project consists of the replacement of approx 987' and installation of approx 405' of 8" DIP water main, replacement of approx 10' and installation of approx 22' of 10" DIP water main, replacement of approx 55 and installation of approx 54' of 12" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, installation of 18 fire hydrants and 125 water house connections.
Posted Date
Dec 14, 2025
Due Date
Jan 27, 2026
Release: Dec 14, 2025
Close: Jan 27, 2026
Water main replacement. This project consists of the replacement of approx 987' and installation of approx 405' of 8" DIP water main, replacement of approx 10' and installation of approx 22' of 10" DIP water main, replacement of approx 55 and installation of approx 54' of 12" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, installation of 18 fire hydrants and 125 water house connections.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →