Constructing the Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe on SR-8 (US-80) from the Marengo County Line to the Dallas County Line. Length 6.144 mi. RFP
Description: The Alabama Department of Transportation is soliciting a construction contractor for safety widening, planing, scrub-seal resurfacing, bridge guardrail retrofit and guardrail installation, and traffic striping on SR-8 (US-80) between the Marengo County Line and the Dallas County Line in Perry County. The work covers 6.144 miles and allows 75 working days. The item summary lists pavement preparation and paving, guardrail work, traffic striping, and traffic-control items.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
The Alabama Department of Transportation seeks construction of safety widening, micro-milling, scrub-seal resurfacing, guardrail installation, and traffic striping, including lane reduction and widening, along 9.213 miles of SR-235 from SR-38 (US-280) north of Childersburg to CR-190 (Kings Chapel Road). The listed principal work includes tack coat, pavement micro-milling and bituminous layers, scrub seal, and guardrail installation and end anchors. The project is in Talladega County and has a contract time of 110 working days.
This is an Alabama Department of Transportation highway construction contract for scrub-seal resurfacing, guardrail installation, and traffic striping on SR-1 (US-231). The 6.111-mile project extends from the Florida state line to Smithville Road south of Dothan in Houston County. The listed contract time is 85 working days.
ALDOT’s solicitation is for construction work on 5.000 miles of SR-6 (US-82) in Pickens County, from the Mississippi State Line to the junction of Bradshaw Road northeast of Reform. The work includes micro-milling, scrub-seal resurfacing, guardrail installation, and traffic stripe. The contract time is 100 working days.
ALDOT seeks bids for a 7.104-mile SR-139 project in Bibb County, extending from 0.780 mile north of the junction of CR-42 to the Shelby County Line. The work includes safety scoring, micro-milling, scrub seal resurfacing, guardrail installation, and traffic striping. The proposal specifies a 60-working-day contract time.
Key Contacts on this RFP
Decision makers connected to this RFP from Alabama Department of Transportation.