Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The approximate major quantities: Common Embankment - 1041 CY.; Common Excavation - 212 CY.; Aggregate Surfacing. Class 2 - 858 TON; 12x6 Precast Concrete Box Culvert End Section - 6 EA; 12x8 Precast Box Culvert End Section - 4 EA; 16x8 Precast Concrete Box Culvert End Section - 2 EA; 12x6 Precast Concrete Box Culvert 124 LF.; 12x8 Precast Concrete Box Culvert - 84 L.F.;16x8 Precast Concrete Box Culvert - 44 LF.; Random Riprap Class III - 340 CY.; Random Riprap Class IV – 599 CY.; Traffic Control - 1 LS
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge approach construction & bridge installation on corridor. Project also consists of installation of two pre-purchased, pre-fab modular new bridges (one 70’x14’ and another 50’x14’) into these same locations. Contractor will be required to coordinate with bridge fabricator (ADM Welding & Fabrication) to deliver bridges to site when contractor is ready to set bridges in place.
Posted Date
Jan 13, 2026
Due Date
Mar 5, 2026
Release: Jan 13, 2026
Close: Mar 5, 2026
Bridge approach construction & bridge installation on corridor. Project also consists of installation of two pre-purchased, pre-fab modular new bridges (one 70’x14’ and another 50’x14’) into these same locations. Contractor will be required to coordinate with bridge fabricator (ADM Welding & Fabrication) to deliver bridges to site when contractor is ready to set bridges in place.
AvailableProject includes Grading, Bituminous Surface, and Bridge No. 45X22.
Posted Date
Jan 2, 2026
Due Date
Jan 28, 2026
Release: Jan 2, 2026
Close: Jan 28, 2026
Project includes Grading, Bituminous Surface, and Bridge No. 45X22.
AvailableIllinois DOT is soliciting bids to construct a single-span PPC deck beam bridge carrying Birds Lane over Brushy Fork in Lawrence County. Work includes HMA approach pavement, guardrail, and associated roadway and drainage items. The project is part of the January 16, 2026 letting and specifies 40 working days.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Illinois DOT is soliciting bids to construct a single-span PPC deck beam bridge carrying Birds Lane over Brushy Fork in Lawrence County. Work includes HMA approach pavement, guardrail, and associated roadway and drainage items. The project is part of the January 16, 2026 letting and specifies 40 working days.
Construct Bridge 87J74 (replaces Bridge 87560).
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
Close: Feb 10, 2026
Construct Bridge 87J74 (replaces Bridge 87560).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis