Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of this project is the consolidation of the Satellite Sterile Storage rooms containing RMD located throughout the hospital, and the upgrade of the HVAC systems serving these areas. General construction work includes demolition, infectious control measures, carpentry, new doors, finish work, temporary connections, and all related work. Electrical work includes demolition, new electrical branch circuits, device relocation, and lighting modifications. Mechanical work includes new VAV terminal units, equipment balancing, new ductwork, and diffusors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The U.S. Department of Veterans Affairs (West Palm Beach VA Medical Center) is soliciting contractors to remove and replace cabinets and flooring in the OR Sub-Sterile Rooms at the West Palm Beach VA Medical Center. The procurement requires full labor, materials, tools, and equipment, compliance with infection control and safety regulations, and submission of technical and price proposals; the project is expected to take 90 days. Site visit and pre-bid activities are scheduled in January 2026 and proposals are due in February 2026.
Posted Date
Jan 16, 2026
Due Date
Feb 13, 2026
Release: Jan 16, 2026
Close: Feb 13, 2026
The U.S. Department of Veterans Affairs (West Palm Beach VA Medical Center) is soliciting contractors to remove and replace cabinets and flooring in the OR Sub-Sterile Rooms at the West Palm Beach VA Medical Center. The procurement requires full labor, materials, tools, and equipment, compliance with infection control and safety regulations, and submission of technical and price proposals; the project is expected to take 90 days. Site visit and pre-bid activities are scheduled in January 2026 and proposals are due in February 2026.
AvailableCON CTX Consolidate Engineering Bldg. 17.
Posted Date
Dec 23, 2025
Due Date
Jan 30, 2026
Release: Dec 23, 2025
Close: Jan 30, 2026
CON CTX Consolidate Engineering Bldg. 17.
AvailableAll the work area should be sealed using two layers of 0.15 millimeters 6 mil poly (IHFOM, CH 13, Sec. 3), and negative pressure containment shall be installed by the contractor prior to start of demolition work and shall remain for the duration of the project, exhausting to the nearest outside exterior window. The contractor shall cover all vents from the area of construction. Demolition: The contractor shall remove existing vinyl flooring, approx. 123 SF in 2A-211A, and 99 SF in 2A-207A from the sub-sterile rooms. The contractor shall remove 2 bottom cabinets in 2A-207A (1 sink cabinet 42” x 24” x 36” and 1 cabinet 48” x 24” x 36”), and 2 top cabinets (one 42” x 16” x 49” and the other 48” x 16” x 49”) and remove countertop approx. 95” x 24”. The contractor shall remove a large sink approx. 3 ft. with no cabinets (see attached picture IMG_0562 for reference) from 2A-211A, this sink is to be removed and preserved, provide to FMS staff. See attached file.
Posted Date
Jan 16, 2026
Due Date
Feb 13, 2026
Work includes science and engineering rooms renovation.
Posted Date
Jan 22, 2026
Due Date
Feb 11, 2026
Release: Jan 22, 2026
Close: Feb 11, 2026
Work includes science and engineering rooms renovation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 13, 2026
All the work area should be sealed using two layers of 0.15 millimeters 6 mil poly (IHFOM, CH 13, Sec. 3), and negative pressure containment shall be installed by the contractor prior to start of demolition work and shall remain for the duration of the project, exhausting to the nearest outside exterior window. The contractor shall cover all vents from the area of construction. Demolition: The contractor shall remove existing vinyl flooring, approx. 123 SF in 2A-211A, and 99 SF in 2A-207A from the sub-sterile rooms. The contractor shall remove 2 bottom cabinets in 2A-207A (1 sink cabinet 42” x 24” x 36” and 1 cabinet 48” x 24” x 36”), and 2 top cabinets (one 42” x 16” x 49” and the other 48” x 16” x 49”) and remove countertop approx. 95” x 24”. The contractor shall remove a large sink approx. 3 ft. with no cabinets (see attached picture IMG_0562 for reference) from 2A-211A, this sink is to be removed and preserved, provide to FMS staff. See attached file.