Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Concord
Rehabilitate the existing leaking sewer lateral connection. The rehabilitation shall be performed using a one-piece main-to-lateral cured-in-place pipe (CIPP) liner system, such as LMK Technologies’ T-Liner or approved equal, meeting ASTM F2561.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Concord Township
The solicitation seeks trenchless rehabilitation of a leaking sewer lateral connection at 12 Union School Way using a one-piece main-to-lateral cured-in-place pipe (CIPP) liner system meeting ASTM F2561 standards. Work includes pre-construction CCTV inspection, installation of the CIPP liner with testing/cure monitoring, and post-installation inspection, with substantial completion expected within 30 days of commencement.
Posted Date
Nov 20, 2025
Due Date
Dec 9, 2025
Release: Nov 20, 2025
Concord Township
Close: Dec 9, 2025
The solicitation seeks trenchless rehabilitation of a leaking sewer lateral connection at 12 Union School Way using a one-piece main-to-lateral cured-in-place pipe (CIPP) liner system meeting ASTM F2561 standards. Work includes pre-construction CCTV inspection, installation of the CIPP liner with testing/cure monitoring, and post-installation inspection, with substantial completion expected within 30 days of commencement.
AvailableCharter Township of Clinton
Work includes approx 1 LS 6" CIPP lining sewer lateral; 6 EA post construction CCTV sewer lead; 1 LS turf restoration.
Posted Date
Nov 18, 2025
Due Date
Dec 2, 2025
Release: Nov 18, 2025
Charter Township of Clinton
Close: Dec 2, 2025
Work includes approx 1 LS 6" CIPP lining sewer lateral; 6 EA post construction CCTV sewer lead; 1 LS turf restoration.
AvailableCity of Monterey
The City of Monterey seeks bids to rehabilitate approximately 1,812 linear feet of sanitary sewer pipe using cured‑in‑place pipe (CIPP), including bypass pumping and offsite disposal of sewer material as needed. This publicly funded city project is currently bidding with a bid date of December 9, 2025.
Posted Date
-
Due Date
Dec 9, 2025
City of Monterey
Close: Dec 9, 2025
The City of Monterey seeks bids to rehabilitate approximately 1,812 linear feet of sanitary sewer pipe using cured‑in‑place pipe (CIPP), including bypass pumping and offsite disposal of sewer material as needed. This publicly funded city project is currently bidding with a bid date of December 9, 2025.
AvailableLoxahatchee River Environmental Control District
Work includes 30 EA ls011 system - cipp lateral lining, 8" to 10" full circle main connection, 4" or 6" x 4.5 mm lateral piping, minimum 30 LF of lateral (all depths); 260 LF ls011 system - cipp lateral lining, 4" or 6" x 4.5 mm lateral piping, beyond 30 LF of lateral (all depths); 1 LS ls011 system - bypass pumping; 337 EA ls012 system - cipp lateral lining, 8" to 10" full circle main connection, 4" or 6" x 4.5 mm lateral piping, minimum 30 LF of lateral (all depths). See attached file.
Posted Date
Sep 3, 2025
Due Date
Dec 2, 2025
Release: Sep 3, 2025
Loxahatchee River Environmental Control District
Close: Dec 2, 2025
Work includes 30 EA ls011 system - cipp lateral lining, 8" to 10" full circle main connection, 4" or 6" x 4.5 mm lateral piping, minimum 30 LF of lateral (all depths); 260 LF ls011 system - cipp lateral lining, 4" or 6" x 4.5 mm lateral piping, beyond 30 LF of lateral (all depths); 1 LS ls011 system - bypass pumping; 337 EA ls012 system - cipp lateral lining, 8" to 10" full circle main connection, 4" or 6" x 4.5 mm lateral piping, minimum 30 LF of lateral (all depths). See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis