Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform deep concrete repair work at designated areas. Perform shallow concrete repair work. Perform concrete beam and crack repair. Perform demolition of an overhead cantilever walkway at the synagro building. Install six (6) stainless steel columns in two sludge blending tanks. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide demolition and replacement services for asphalt paving and concrete flatwork.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Provide demolition and replacement services for asphalt paving and concrete flatwork.
AvailableWork includes installation of barriers around the column bases. Remove column base protection concrete. Remove sidewalk and / or street and excavate down to column baseplates. Repair columns in accordance with approved shop drawings, install column base protection concrete and restore sidewalk and / or street.
Posted Date
Dec 5, 2025
Due Date
Jan 15, 2026
Release: Dec 5, 2025
Close: Jan 15, 2026
Work includes installation of barriers around the column bases. Remove column base protection concrete. Remove sidewalk and / or street and excavate down to column baseplates. Repair columns in accordance with approved shop drawings, install column base protection concrete and restore sidewalk and / or street.
AvailableAbutment Repairs, Erosion Repairs, Concrete Spall Repairs includes, 1,650 SF, Special Surface Finish. 2,607 UNIT, Traffic Control Signs. 39 SF, Spall Repair.
Posted Date
Nov 17, 2025
Due Date
Dec 12, 2025
Release: Nov 17, 2025
Close: Dec 12, 2025
Abutment Repairs, Erosion Repairs, Concrete Spall Repairs includes, 1,650 SF, Special Surface Finish. 2,607 UNIT, Traffic Control Signs. 39 SF, Spall Repair.
Replacement of two steel storage tanks at a functioning wwtp, coordinate with demolition company to remove old tanks, installation of walkways, one stairwell and connection to existing air lines, minor welding will be required on site.
Posted Date
-
Due Date
Jan 5, 2026
Close: Jan 5, 2026
Replacement of two steel storage tanks at a functioning wwtp, coordinate with demolition company to remove old tanks, installation of walkways, one stairwell and connection to existing air lines, minor welding will be required on site.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis