Mississippi Department of Transportation
State AgencyMS
Posted
Oct 30, 2026
Nov 24, 2026
NHPP-0007-01(097) - US 72 From SR 25 to Alabama State Line - Concrete Repair RFP
Work includes 226 LF removal of bridge, 24 SY removal of bridge deck, 364 SY removal of bridge end pavement, 318 CY flowable fill, excavatable, 3,616 SF permanent steel sheet piling, 1,293 pounds reinforcement, 2,668 SY removal of bridge deck, hydrodemolition, 6,000 pounds undersealing, 374 SY reinforced cement concrete bridge end pavement, 12 CY bridge concrete, class aa, 148 CY bridge deck overlay concrete, 328 LF joint repair, 168 LF preformed joint seal, type iii, 328 LF saw cut, type iii, 8 SF general epoxy repair, 38 SF frp wrap, bi-directional, 4 EA cap cleaning, 24 EA bearing replacements, prestressed concrete girder, 1,264 LF bridge repair, class 2 spray finish. See attached file.
