Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Lake Stevens
Plan, construct, and manage a regional multi-use community recreation and sports complex, envisioned to be a modern, multi-use community asset that serves all age groups, with robust recreational programming, senior services, and an indoor synthetic turf sports complex.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Hart County
Sports & Recreation Complex Batting Cage Cover. Description: Building: 38'W x 120'L; New Concrete: 38'x 42' (added to the left side of the current batting cages); Roof: Dark Green (Color matches other buildings in the park); Trim Color: Dark Green (Color matches other buildings in the park); Siding Color: Dark Green (Color matches other buildings in the park); Frame Spacing: 3' O.C.; Roof Style: A Frame Vertical; Roof Pitch: 3/12; Roofing Overhang: 6"; Leg Style: Double Legs; Gauge: 14 Gauge Framing; Engineer Certified: 130/30 Certification; Leg Height: 13'; Left Side: Top - 3' Panel - Siding: Vertical Right Side: Top - 3' Panel - Siding: Vertical Front End: Gable End - Siding: Vertical Back End: Gable End - Siding: Vertical Color Matching Screws; Gutters and Down Spouts: Each side of structure - front and back - down spouts to be at same end of the structure - water shall be channeled away from the structure.
Posted Date
Oct 15, 2025
Due Date
Nov 20, 2025
Release: Oct 15, 2025
Hart County
Close: Nov 20, 2025
Sports & Recreation Complex Batting Cage Cover. Description: Building: 38'W x 120'L; New Concrete: 38'x 42' (added to the left side of the current batting cages); Roof: Dark Green (Color matches other buildings in the park); Trim Color: Dark Green (Color matches other buildings in the park); Siding Color: Dark Green (Color matches other buildings in the park); Frame Spacing: 3' O.C.; Roof Style: A Frame Vertical; Roof Pitch: 3/12; Roofing Overhang: 6"; Leg Style: Double Legs; Gauge: 14 Gauge Framing; Engineer Certified: 130/30 Certification; Leg Height: 13'; Left Side: Top - 3' Panel - Siding: Vertical Right Side: Top - 3' Panel - Siding: Vertical Front End: Gable End - Siding: Vertical Back End: Gable End - Siding: Vertical Color Matching Screws; Gutters and Down Spouts: Each side of structure - front and back - down spouts to be at same end of the structure - water shall be channeled away from the structure.
AvailableCity of Vineland
Romano Sports Complex.
Posted Date
Oct 21, 2025
Due Date
Nov 25, 2025
Release: Oct 21, 2025
City of Vineland
Close: Nov 25, 2025
Romano Sports Complex.
AvailableBorough of New Providence
Providing sports instruction for kids and adults.
Posted Date
Nov 10, 2025
Due Date
Dec 10, 2025
Release: Nov 10, 2025
Borough of New Providence
Close: Dec 10, 2025
Providing sports instruction for kids and adults.
AvailableColorado Mesa University
Qualified CMGC contractors for the athletic complex project. This project proposes construction of a two-story athletic complex complete with a locker room equipped with 126 lockers, restroom, showers, sports medicine and separate exam rooms, multiple break out rooms separate team meeting rooms, coaches offices and separate locker room, separate officials locker room and restroom, all on the first floor, with a panoramic viewing platform complete with pre function space, a catering kitchen, public restroom and exterior seating on the second floor. The new structure will replace an existing building on the site.
Posted Date
Nov 3, 2025
Due Date
Nov 21, 2025
Release: Nov 3, 2025
Colorado Mesa University
Close: Nov 21, 2025
Qualified CMGC contractors for the athletic complex project. This project proposes construction of a two-story athletic complex complete with a locker room equipped with 126 lockers, restroom, showers, sports medicine and separate exam rooms, multiple break out rooms separate team meeting rooms, coaches offices and separate locker room, separate officials locker room and restroom, all on the first floor, with a panoramic viewing platform complete with pre function space, a catering kitchen, public restroom and exterior seating on the second floor. The new structure will replace an existing building on the site.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis