Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work will include but is not limited to the removal of existing playground equipment and wood fiber safety surfacing and the construction of a new playground including installation of new, inclusive playground equipment and poured-in-place rubber safety surfacing, concrete sidewalk and curbing, drainage infrastructure, fencing, minimal HMA pavement modifications, lawn restoration and tree planting. The contractor is responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construction Documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide professional services for the installation of site improvements associated with a new playground.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Provide professional services for the installation of site improvements associated with a new playground.
AvailableDesign, supply, and installation of playground site improvements at Carroll Park.
Posted Date
-
Due Date
Jan 14, 2026
Release: -
Close: Jan 14, 2026
Design, supply, and installation of playground site improvements at Carroll Park.
AvailableThe County of Ventura Public Works Agency is soliciting bids for improvements at Kenney Grove Park in Fillmore, California. The scope includes construction of pavement and sidewalk improvements and upgrades to an existing bathroom facility, with plans and specifications provided on the portal. Bids are due January 27, 2026 at 2:00 PM PST via the Bonfire portal, and a non-mandatory pre-bid meeting is scheduled for January 14, 2026 at the park.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
The County of Ventura Public Works Agency is soliciting bids for improvements at Kenney Grove Park in Fillmore, California. The scope includes construction of pavement and sidewalk improvements and upgrades to an existing bathroom facility, with plans and specifications provided on the portal. Bids are due January 27, 2026 at 2:00 PM PST via the Bonfire portal, and a non-mandatory pre-bid meeting is scheduled for January 14, 2026 at the park.
Project includes 9,968 SF demolition of concrete paving (walkways and pads), 11,585 SF demolition of playground sand, 1 LS relocate existing storm drains, 15,000 CY earthwork / rough grading, 90,000 SF clearing and grubbing, 22,968 SF provide, grade, and compact class II sub base, 240 LF 12" wide concrete play area perimeter bond beam, 1 LS 28 playground equipment, 10,402 SF poured-in-place resilient rubber surfacing, 1 LS site lighting, see attached file.
Posted Date
Dec 16, 2025
Due Date
Jan 27, 2026
Release: Dec 16, 2025
Close: Jan 27, 2026
Project includes 9,968 SF demolition of concrete paving (walkways and pads), 11,585 SF demolition of playground sand, 1 LS relocate existing storm drains, 15,000 CY earthwork / rough grading, 90,000 SF clearing and grubbing, 22,968 SF provide, grade, and compact class II sub base, 240 LF 12" wide concrete play area perimeter bond beam, 1 LS 28 playground equipment, 10,402 SF poured-in-place resilient rubber surfacing, 1 LS site lighting, see attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis