Construction of two nutrient reduction wetlands, one contract. This project is for a pumped nutrient reduction wetland, In general, the work involves, selective clearing, excavation and grading, installation of lift stations with solar powered pumps, forcemain, tile, inlet risers, water control structures, drawdown pipes, riprap and seeding. This project includes a total of about 31,200 CY of earthwork; installation of a water control structure, inlet risers, 833 LF of polyethylene pipe, a complete lift station with 2 solar powered pumps systems with battery, 92 LF of PVC SCH-80 forcemain, 177 LF of CMP drawdown pipe, 330 Tons of riprap and clean stone, 560 SY of turf reinforcing mat type 2B RECP, 472 LF of silt fence and 16.6 AC of seeding. This project is for a pumped nutrient reduction wetland, CAL883229BS. In general, the work involves, selective clearing, excavation and grading, installation of lift stations with solar powered pumps, forcemain, tile, inlet risers, water control structures, drawdown pipes, riprap and seeding. This project includes a total of about 10,300 CY of earthwork; installation of a water control structure, inlet riser, 210 LF of polyethylene pipe, a complete lift station with a solar powered pump system with battery, 27 LF of PVC SCH-80 forcemain, 114 LF of CMP drawdown pipe, 250 Tons of riprap and clean stone, 395 SY of turf reinforcing mat type 2B RECP, 304 LF of silt fence and 1.0 AC of seeding.
Available