Summary
The project generally consists of the following work: Construction of approx. 535 LF of 6" diameter HDPE storm sewer force main and connection to an existing manhole on Rhododendron Drive, installation of a new wet well, valve vault, and power disconnect cabinet to be provided by the Owner, modifications to the existing storm sewer system, installation of one catch basin and approx. 40 LF of new 12" diameter storm sewer pipe, construction of a new power and controls pedestal, trenching work to support electrical and conduit installation work by others, all required site work, and support during the startup and testing of the new stormwater pump station.