Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 1,765 CY of Unclassified Excavation; 575 CY of Deduct Asphalt Mat Removal Items; 414 CY of Embankment; 776 of Excess Material Leftover. See outside link.14537648
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
Premium
Access the largest public sector contact database
Close: Dec 16, 2025
Provide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
AvailableDesign-Bid-Build. To provide Comprehensive Construction Management and Inspection Services (CMIS) for the Shoreline Drive Realignment Project the Shoreline Drive Realignment Project (Project), a transformative infrastructure initiative designed to reconnect Downtown Long Beach and improve multimodal transportation options. This high-visibility project funded in part by a federal Reconnecting Communities Program grant will realign Shoreline Drive, remove outdated infrastructure barriers, and construct new pedestrian and bicycle-friendly routes.
Posted Date
Nov 11, 2025
Due Date
Jan 8, 2026
Release: Nov 11, 2025
Close: Jan 8, 2026
Design-Bid-Build. To provide Comprehensive Construction Management and Inspection Services (CMIS) for the Shoreline Drive Realignment Project the Shoreline Drive Realignment Project (Project), a transformative infrastructure initiative designed to reconnect Downtown Long Beach and improve multimodal transportation options. This high-visibility project funded in part by a federal Reconnecting Communities Program grant will realign Shoreline Drive, remove outdated infrastructure barriers, and construct new pedestrian and bicycle-friendly routes.
AvailableWork includes grade separation construction support services.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
Work includes grade separation construction support services.
AvailableProvide remedial construction services.
Posted Date
Dec 5, 2025
Due Date
Jan 23, 2026
Release: Dec 5, 2025
Close: Jan 23, 2026
Provide remedial construction services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis