Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide oversight services for the construction of an athletic complex. Work consist of the construction of a grass baseball/multi-use field, utilities, and stormwater management. Familiarize itself with the project expectations by reviewing the project plans and specifications, project cost estimates, project schedule, and bid packages. Attend scheduled project meetings with the owner, engineer and construction manager. Familiarize itself with community desires as expressed through public hearings, selectboard meetings and the rec advisory committee. The clerk shall be on site no less than what is determined necessary to perform the required duties. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include: standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures.
Posted Date
Sep 16, 2025
Due Date
Jan 23, 2026
Release: Sep 16, 2025
Close: Jan 23, 2026
Construct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include: standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures.
AvailableProvide construction management services for the frontier schools athletic complex & transportation facility.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Provide construction management services for the frontier schools athletic complex & transportation facility.
The California Department of Industrial Relations (DIR) is soliciting proposals for Phase 2 Functionality and Maintenance & Operations (M&O) Services for the Labor Enforcement Task Force/Public Works (LETF/PW) project, including development of a LETF case management system and ServiceNow PSDS implementations for multiple business units. The work includes integration with Google Cloud Platform for analytics and Looker reporting, enterprise document management and mapping requirements, and ongoing M&O support for Phase 1 applications while Phase 2 is developed. The contract term begins upon California Department of Technology approval for two years with two optional one-year extensions (maximum four years).
Posted Date
Dec 13, 2025
Due Date
Feb 19, 2026
Release: Dec 13, 2025
Close: Feb 19, 2026
Provide construction services for phase 1 of a multi-phase construction project. Phase 1 of the project includes site demolition and preparation.
Posted Date
Jan 2, 2026
Due Date
Jan 23, 2026
Release: Jan 2, 2026
Close: Jan 23, 2026
Provide construction services for phase 1 of a multi-phase construction project. Phase 1 of the project includes site demolition and preparation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The California Department of Industrial Relations (DIR) is soliciting proposals for Phase 2 Functionality and Maintenance & Operations (M&O) Services for the Labor Enforcement Task Force/Public Works (LETF/PW) project, including development of a LETF case management system and ServiceNow PSDS implementations for multiple business units. The work includes integration with Google Cloud Platform for analytics and Looker reporting, enterprise document management and mapping requirements, and ongoing M&O support for Phase 1 applications while Phase 2 is developed. The contract term begins upon California Department of Technology approval for two years with two optional one-year extensions (maximum four years).
Available