Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Estimated major quantities are as follows: 13,800 lf draintile pipe removal; 67,000 cy common excavation; 16,000 sq yd geotextile fabric, type 5; 11,200 sq yd 4 thick bituminous pavement; 8,400 lft 6" perforated pvc pipe drain. Along with miscellaneous utility and roadway improvements, removals, and restoration. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Securing the work area for public safety, and site cleanup daily, clearing and grubbing, traffic control; water pollution control program; placement of hot mix asphalt (hma); replacement of concrete curb, gutter, curb ramps, and sidewalk; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; relocation of roadside signs, temporary striping restorations
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Securing the work area for public safety, and site cleanup daily, clearing and grubbing, traffic control; water pollution control program; placement of hot mix asphalt (hma); replacement of concrete curb, gutter, curb ramps, and sidewalk; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; relocation of roadside signs, temporary striping restorations
Premium
Access the largest public sector contact database
Work includes construction of 5' wide concrete sidewalk, access connections, culverts, and any incidental work. The total length of the improvements is approx. 2,365 LF of sidewalk.
Posted Date
Nov 20, 2025
Due Date
Jan 6, 2026
Release: Nov 20, 2025
Close: Jan 6, 2026
Work includes construction of 5' wide concrete sidewalk, access connections, culverts, and any incidental work. The total length of the improvements is approx. 2,365 LF of sidewalk.
AvailableWork includes capital improvements project - phase 1 that includes contract #101 - general trades; contract #102 - mechanical; contract #103 - electrical; contract #104 - plumbing; contract #105 - site contract. The project consists of mechanical unit replacements and installations, renovation of a gymnasium, replacement of artificial turf field and track cleaning, mechanical unit replacements and installations, and mechanical unit replacements and installations as well as construction of two grass soccer fields and a parking lot.
Posted Date
Dec 8, 2025
Due Date
Jan 27, 2026
Release: Dec 8, 2025
Close: Jan 27, 2026
Work includes capital improvements project - phase 1 that includes contract #101 - general trades; contract #102 - mechanical; contract #103 - electrical; contract #104 - plumbing; contract #105 - site contract. The project consists of mechanical unit replacements and installations, renovation of a gymnasium, replacement of artificial turf field and track cleaning, mechanical unit replacements and installations, and mechanical unit replacements and installations as well as construction of two grass soccer fields and a parking lot.
AvailableNorthwest waterworks improvements phase III.
Posted Date
Nov 5, 2025
Due Date
Dec 19, 2025
Release: Nov 5, 2025
Close: Dec 19, 2025
Northwest waterworks improvements phase III.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis