Summary
Work is to be included with Base Bid, add 4,000 sf of asphalt patching. Include cutting out a maximum of six (6) inches asphalt, applying tack coat and applying new asphalt as required. Locations to be determined upon award of contract prior to start of project. Provide saw cuts and remove damaged asphalt to a minimal depth which provides a solid base. rock fill as needed to a depth of 3” for asphalt. Provide tack coat prior to placement of asphalt. 2. Place Type S5 Asphalt within patch cuts. 3. Parking bumpers will be removed and replaced by Contractor. 4. Clean all parking surfaces free of debris and loose materials. 5. Clean all cracks and joint free of debris and vegetation, 6. Seal all cracks with a hot fill material as appropriate for asphalt. 7. Seal coat all parking surfaces with 2 coats. 8. Strip and paint symbols within all parking and street surfaces.