Summary
The City of Oregon City is soliciting sealed bids from qualified contractors for the Clairmont Area Sanitary Sewer Rehabilitation Project (CI 25-004), which will address infiltration and inflow (I&I) in the drainage basin of the Settlers Point Pump Station by lining a portion of the existing sanitary sewer system. The work includes CIPP lining of approximately 194 LF of 6-inch, 1,432 LF of 8-inch, and 1,370 LF of 10-inch sanitary sewer mains; rehabilitation of approximately 43 sanitary sewer laterals; replacement of three sanitary sewer manholes; rehabilitation of 16 manholes; installation of 44 cleanouts; separation of an existing party sewer connection; replacement of impacted concrete driveway panels; and restoration of all disturbed surfaces. Sealed bids are due at 2:00 PM (local Pacific time) on July 14, 2026 to the Oregon City Engineering and Operations Center; solicitation documents are available exclusively through DemandStar per the City.