Construct three new 30' round fiberglass rearing ponds and three new concrete raceways, and a new larger pollution abatement pond, all within the existing hatchery footprint includes mobilization, erosion control, demolition, and incidentals: mobilize, install, maintain and remove erosion control measures, demobilize and any other work. Site work: fill and grade the site. Supply piping: install supply piping from distribution tower, recirculation water supply piping, recirculation water piping, washdown supply piping. Drain piping: install drain piping for rearing facility, overflow drain, cleaning waste, pollution abatement pond, fish release and roof drains. Construct building to house pRAS equipment. pRAS equipment: provide and install all pRAS equipment for both systems to include oxygen generating equipment. Round ponds: provide and install three 30-foot diameter round ponds complete with sidebox, first pass water supply, recirculated water supply, overflow, and center drain. Raceways: construct three 10x100 raceways complete with access stairs and walkways, first pass headers, recirculated water headers, swing pipes, and stop logs. Pollution abatement pond: construct one single cell pollution abatement pond complete with a cover. Site electrical: install conduit, wiring, and all associated appurtenances to form complete and operational electrical system to include conduit for WDFW to install alarm system. Construct building to house new rearing structures.
Available