Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Brentwood
Provide engineering design services for citywide non-potable water distribution project. The existing pump station consists of two booster pumps and a jockey pump located in a concrete masonry unit (CMU) utility building.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Aspendell Mutual Water Company
Operation, testing and maintenance of AMWC's Community Water System. This water system provides drinking water and firefighting water to a community about 17 miles southwest of Bishop.
Posted Date
Nov 22, 2025
Due Date
Dec 20, 2025
Release: Nov 22, 2025
Aspendell Mutual Water Company
Close: Dec 20, 2025
Operation, testing and maintenance of AMWC's Community Water System. This water system provides drinking water and firefighting water to a community about 17 miles southwest of Bishop.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Vermont Agency of Administration
Owner currently maintains multiple retainer contracts for several categories of services and now seeks to modify service categories and qualify and/or re-qualify contractors. The retainer contracts enable State Agencies and Departments to quickly and efficiently complete small construction and maintenance projects. Owner seeks to contract with suppliers of bulk potable water (“Bulk Water”) for use in water systems during emergency situations or as otherwise requested by the State, municipality, or political subdivision.
Posted Date
Nov 14, 2025
Due Date
Dec 3, 2025
Release: Nov 14, 2025
Vermont Agency of Administration
Close: Dec 3, 2025
Owner currently maintains multiple retainer contracts for several categories of services and now seeks to modify service categories and qualify and/or re-qualify contractors. The retainer contracts enable State Agencies and Departments to quickly and efficiently complete small construction and maintenance projects. Owner seeks to contract with suppliers of bulk potable water (“Bulk Water”) for use in water systems during emergency situations or as otherwise requested by the State, municipality, or political subdivision.
AvailableCalifornia Department of Transportation
Work consists of convert potable water irrigation system to recycled water, include 45,500 SF of rolled erosion control product; 48,700 SF of weed germination; 17,088 LF of (f) - 1" plastic pipe (schedule 40) (supply line); 7,699 LF of (f) - 1 1/4" plastic pipe (schedule 40) (supply line); 5,250 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 9,664 LF of (f) - 3" plastic pipe (class 315) (supply line); 5,145 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 3,615 LF of (f) - 4" plastic pipe (class 315) (supply line). See outside link.
Posted Date
Nov 12, 2024
Due Date
Jan 8, 2026
Release: Nov 12, 2024
California Department of Transportation
Close: Jan 8, 2026
Work consists of convert potable water irrigation system to recycled water, include 45,500 SF of rolled erosion control product; 48,700 SF of weed germination; 17,088 LF of (f) - 1" plastic pipe (schedule 40) (supply line); 7,699 LF of (f) - 1 1/4" plastic pipe (schedule 40) (supply line); 5,250 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 9,664 LF of (f) - 3" plastic pipe (class 315) (supply line); 5,145 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 3,615 LF of (f) - 4" plastic pipe (class 315) (supply line). See outside link.
AvailableFermi National Accelerator Laboratory (Fermilab) (Contractor)
Provide PIP-II Cryogenic Distribution System - Distribution Valve Box.
Posted Date
Oct 24, 2025
Due Date
Nov 29, 2025
Release: Oct 24, 2025
Fermi National Accelerator Laboratory (Fermilab) (Contractor)
Close: Nov 29, 2025
Provide PIP-II Cryogenic Distribution System - Distribution Valve Box.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →