Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Vermont Agency of Administration
Owner currently maintains multiple retainer contracts for several categories of services and now seeks to modify service categories and qualify and/or re-qualify contractors. The retainer contracts enable State Agencies and Departments to quickly and efficiently complete small construction and maintenance projects. Owner seeks to contract with suppliers of bulk potable water (“Bulk Water”) for use in water systems during emergency situations or as otherwise requested by the State, municipality, or political subdivision.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Vermont Department of Buildings and General Services, Office of Purchasing and Contracting
The State of Vermont’s Buildings & General Services, Office of Purchasing & Contracting is soliciting sealed proposals for the supply of bulk potable water. Proposals are due December 3, 2025 at 4:30 PM Eastern.
Posted Date
Nov 14, 2025
Due Date
Dec 3, 2025
Release: Nov 14, 2025
Vermont Department of Buildings and General Services, Office of Purchasing and Contracting
Close: Dec 3, 2025
The State of Vermont’s Buildings & General Services, Office of Purchasing & Contracting is soliciting sealed proposals for the supply of bulk potable water. Proposals are due December 3, 2025 at 4:30 PM Eastern.
AvailableHamilton Township Municipal Utilities Authority
The supply and delivery of the Potable Water Chemicals. Liquid Chlorine, Hydrated Lime, Sodium Hypochlorite.
Posted Date
-
Due Date
Nov 19, 2025
Release: -
Hamilton Township Municipal Utilities Authority
Close: Nov 19, 2025
The supply and delivery of the Potable Water Chemicals. Liquid Chlorine, Hydrated Lime, Sodium Hypochlorite.
Placer Co Water Agency
Placer County Water Agency is soliciting bids for the construction and completion of a new potable water supply system serving PCWA Hell Hole facilities and the USFS boat launch parking lot, per plans by Stantec. The work includes site prep, a prefabricated well building, a new vertical well, tanks, power and controls, approximately 2,900 LF of waterlines, and restoration/stabilization of disturbed areas.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Placer Co Water Agency
Close: Dec 18, 2025
Placer County Water Agency is soliciting bids for the construction and completion of a new potable water supply system serving PCWA Hell Hole facilities and the USFS boat launch parking lot, per plans by Stantec. The work includes site prep, a prefabricated well building, a new vertical well, tanks, power and controls, approximately 2,900 LF of waterlines, and restoration/stabilization of disturbed areas.
AvailableCalifornia Department of Transportation
Work consists of convert potable water irrigation system to recycled water, include 45,500 SF of rolled erosion control product; 48,700 SF of weed germination; 17,088 LF of (f) - 1" plastic pipe (schedule 40) (supply line); 7,699 LF of (f) - 1 1/4" plastic pipe (schedule 40) (supply line); 5,250 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 9,664 LF of (f) - 3" plastic pipe (class 315) (supply line); 5,145 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 3,615 LF of (f) - 4" plastic pipe (class 315) (supply line). See outside link.
Posted Date
Nov 12, 2024
Due Date
Jan 8, 2026
Release: Nov 12, 2024
California Department of Transportation
Close: Jan 8, 2026
Work consists of convert potable water irrigation system to recycled water, include 45,500 SF of rolled erosion control product; 48,700 SF of weed germination; 17,088 LF of (f) - 1" plastic pipe (schedule 40) (supply line); 7,699 LF of (f) - 1 1/4" plastic pipe (schedule 40) (supply line); 5,250 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 9,664 LF of (f) - 3" plastic pipe (class 315) (supply line); 5,145 LF of (f) - 2" plastic pipe (schedule 40) (supply line); 3,615 LF of (f) - 4" plastic pipe (class 315) (supply line). See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis