Summary
Work includes approx; equipment, labor, materials and appurtenances required to construct the city square improvements, including concrete sidewalk, parking lot, restroom facility, parking canopy structure, and other such work as may be incidental to city square improvements. 1 ls mobilization; 28 CY common excavation; 25 CY over excavate & replace unsuitable base material; 1,581 SY construct p. C. Concrete, complete in place a. 6" thick pavement; 16,383 sf 6" thick sidewalk; 251 LF construct curb & gutter section, complete in place; 3,361 SY remove & haul a. Asphalt pavement; 405 SY b. Concrete pavement; 248 LF c. Curb & gutter section; 7 EA d. Tree; 3 EA e. Tree stump; 615 SY f. Gravel surfacing; 129 SF g. Concrete sidewalk over stoop. See attached file.