Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Winston
Construction and placement of new gravity sanitary sewer, manholes, inverted sewer siphon and structures, water service, level 3 HMAC paving, and all associated improvements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Dallas Fort Worth International Airport Police Department
The Work of this Contract comprises of providing rehabilitation to existing sanitary sewer inverted siphon junction boxes and reconstruction of the access road and low water crossing to the south junction box structure. Elements of construction include but are not limited interior coating of the inverted siphon junction box structures, junction box lid and access cover reconstruction, reconstruction of the south access road and concrete low water crossing, and providing temporary bypass or diversion of sanitary sewer flows during structure rehabilitation in order to maintain positive flows at full capacity throughout construction.
Posted Date
Oct 20, 2025
Due Date
Dec 3, 2025
Release: Oct 20, 2025
Dallas Fort Worth International Airport Police Department
Close: Dec 3, 2025
The Work of this Contract comprises of providing rehabilitation to existing sanitary sewer inverted siphon junction boxes and reconstruction of the access road and low water crossing to the south junction box structure. Elements of construction include but are not limited interior coating of the inverted siphon junction box structures, junction box lid and access cover reconstruction, reconstruction of the south access road and concrete low water crossing, and providing temporary bypass or diversion of sanitary sewer flows during structure rehabilitation in order to maintain positive flows at full capacity throughout construction.
AvailableWinston Dillard Water District
Removal and disposal of existing 1 MG riveted steel tank and appurtenances including piping, valves and vault at Winston Site. Installation of temporary shoring wall to protect existing 0.5 MG steel bolted tank at Winston Site during construction. Removal, disposal of existing 0.5 MG steel bolted tank and appurtenances at Winston Site. Site preparation, schedule coordination and construction coordination of the new 2.0 MG glss fused steel bolted tank and appurtenances. Tank has been pre-procured per the scope between the Owner and Tank Supplier at the Winston Site. Furnish and install new valve vault, valves, manholes, piping and all other appurtenances. Furnish and install of new Electrical and Supervisory Control and Data Acquisition (SCADA) system equipment at Winston and Dillard Sites. Procurement shall be contracted through Owner's Integrator, Control Systems Northwest. System Integration will be conducted by Owner's Integrator through Owner's contract. Furnish and install Electrical Mixing System at Winston Site and Solar Mixing System at the Dillard Site. Furnish and install a new valve vault and appurtenances, a new hatch with interior ladder and interior coating (floor, 3' from floor and spot coating) at Dillard Site as described on the Bidding Documents. Site grading and restoration. See attached file.
Posted Date
Oct 17, 2025
Due Date
Dec 10, 2025
Release: Oct 17, 2025
Winston Dillard Water District
Close: Dec 10, 2025
Removal and disposal of existing 1 MG riveted steel tank and appurtenances including piping, valves and vault at Winston Site. Installation of temporary shoring wall to protect existing 0.5 MG steel bolted tank at Winston Site during construction. Removal, disposal of existing 0.5 MG steel bolted tank and appurtenances at Winston Site. Site preparation, schedule coordination and construction coordination of the new 2.0 MG glss fused steel bolted tank and appurtenances. Tank has been pre-procured per the scope between the Owner and Tank Supplier at the Winston Site. Furnish and install new valve vault, valves, manholes, piping and all other appurtenances. Furnish and install of new Electrical and Supervisory Control and Data Acquisition (SCADA) system equipment at Winston and Dillard Sites. Procurement shall be contracted through Owner's Integrator, Control Systems Northwest. System Integration will be conducted by Owner's Integrator through Owner's contract. Furnish and install Electrical Mixing System at Winston Site and Solar Mixing System at the Dillard Site. Furnish and install a new valve vault and appurtenances, a new hatch with interior ladder and interior coating (floor, 3' from floor and spot coating) at Dillard Site as described on the Bidding Documents. Site grading and restoration. See attached file.
AvailableDouglas County
This project involves siphon and adjacent sewer replacement, sewer rehabilitation, surface restoration, and creek channel stabilization. See attached file.
Posted Date
Nov 5, 2025
Due Date
Dec 10, 2025
Release: Nov 5, 2025
Douglas County
Close: Dec 10, 2025
This project involves siphon and adjacent sewer replacement, sewer rehabilitation, surface restoration, and creek channel stabilization. See attached file.
AvailableCity of Omaha
The City of Omaha Public Works is soliciting electronic bids via IonWave for OPW 54269 to upgrade the siphon at Thomas Creek and Little Papio in Omaha, Nebraska. Bids are due by 11:00 AM Central Time on the Bid Opening Day, Wednesday, December 10, 2025.
Posted Date
-
Due Date
Dec 10, 2025
City of Omaha
Close: Dec 10, 2025
The City of Omaha Public Works is soliciting electronic bids via IonWave for OPW 54269 to upgrade the siphon at Thomas Creek and Little Papio in Omaha, Nebraska. Bids are due by 11:00 AM Central Time on the Bid Opening Day, Wednesday, December 10, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis