CityIN
Posted
-
Dec 3, 2026
City of Portland CCMG27 RFP
The proposed construction will include HMA patching, milling of the existing roadway with a 1.5-inch HMA surface overlay and all incidental work required, as more fully specified in the Contract Documents and Plans.
