Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1.New membrane skid “C” and appurtenances. New membrane package includes membranes, tanks, pumps, controls, instruments, and various other items as specified in the Procurement Agreement between the City of Myrtle Creek and Aria Filtra. 2.New duplex compressor system and appurtenances. 3.New Supervisory Control and Data Acquisition (SCADA) system. 4.New control panel Programmable Logic Controllers (PLCs), programming updates, and instrumentation upgrades as shown on the Plans and specified herein. 5.Demolition of various Water Treatment Plant (WTP) components as shown on the Plans. 6.New concrete equipment bases as shown on the Plans. 7.Electrical improvements to accommodate expansion to third membrane skid and duplex compressor system. 8.New piping, fittings, valves, supports, hangers, and all other appurtenances for a completely operable installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a new 2.65 MGD PFAS WTP housing PFAS filter vessels at the Tyngsborough Wellfield WTP site. The new PFAS WTP building will be approx. 4,100 SF constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA; Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes; replacement of existing booster pumps, motors, VFDs, wiring, and associated piping work at
Posted Date
Jan 7, 2026
Due Date
Feb 19, 2026
Release: Jan 7, 2026
Close: Feb 19, 2026
Construction of a new 2.65 MGD PFAS WTP housing PFAS filter vessels at the Tyngsborough Wellfield WTP site. The new PFAS WTP building will be approx. 4,100 SF constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA; Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes; replacement of existing booster pumps, motors, VFDs, wiring, and associated piping work at
AvailableGrant program for structural improvements, exterior renovations, lighting, window and door maintenance, exterior painting, cleaning treatments, signage, and awnings for properties within the Myrtle Creek Urban Renewal District.
Posted Date
Jan 1, 2026
Due Date
Jun 15, 2026
Release: Jan 1, 2026
Close: Jun 15, 2026
Grant program for structural improvements, exterior renovations, lighting, window and door maintenance, exterior painting, cleaning treatments, signage, and awnings for properties within the Myrtle Creek Urban Renewal District.
AvailableProject will consist of the construction of three new dual-bed twocell gravity filters equipped with media and leopold type xa underdrain systems. Other contruction will include: new filter effluent, backwash, and rewash pipes installed in the filter building pipe gallery; new air scour piping to support new filters; civil improvements associated with new wash water main serving new filters discharging into existing circular gravity thickener; new asphalt roadway to filters and retacking existing asphalt roadways; improving exterior concrete stairs; relocating hvac condensing unit and refrigerant lines; demolition of supply fans in the high service pump building and ancillary electrical and instrumentation improvements.
Posted Date
Dec 19, 2025
Due Date
Feb 27, 2026
Release: Dec 19, 2025
Close: Feb 27, 2026
Project will consist of the construction of three new dual-bed twocell gravity filters equipped with media and leopold type xa underdrain systems. Other contruction will include: new filter effluent, backwash, and rewash pipes installed in the filter building pipe gallery; new air scour piping to support new filters; civil improvements associated with new wash water main serving new filters discharging into existing circular gravity thickener; new asphalt roadway to filters and retacking existing asphalt roadways; improving exterior concrete stairs; relocating hvac condensing unit and refrigerant lines; demolition of supply fans in the high service pump building and ancillary electrical and instrumentation improvements.
Procurement of chemicals for City of Saginaw WTP and City of Bay City WWTP.
Posted Date
Apr 8, 2024
Due Date
Dec 31, 2099
Release: Apr 8, 2024
Close: Dec 31, 2099
Procurement of chemicals for City of Saginaw WTP and City of Bay City WWTP.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis