Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of a pump house, two (2) 2.0 MG ground water storage tanks, a valve vault, private access roadway, meter vault, and utility appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
JEA is soliciting professional engineering and permitting services to design the Arlington East Water Purification Facility, a production facility sized for an average influent flow of 8 MGD. The core treatment processes include membrane filtration, reverse osmosis, UV advanced oxidation, membrane degasification, and post‑treatment stabilization, with opportunities for optimization in chemical injection, process layout, and site layout. Responses must be submitted electronically via JEA’s Zycus portal following a mandatory pre‑response meeting and optional site visit.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
JEA is soliciting professional engineering and permitting services to design the Arlington East Water Purification Facility, a production facility sized for an average influent flow of 8 MGD. The core treatment processes include membrane filtration, reverse osmosis, UV advanced oxidation, membrane degasification, and post‑treatment stabilization, with opportunities for optimization in chemical injection, process layout, and site layout. Responses must be submitted electronically via JEA’s Zycus portal following a mandatory pre‑response meeting and optional site visit.
AvailableJEA is seeking professional engineering and permitting services for the Arlington East Water Purification Facility, which will include design for membrane filtration, reverse osmosis, and UV advanced oxidation processes.
Posted Date
-
Due Date
Feb 3, 2026
Release: -
Close: Feb 3, 2026
JEA is seeking professional engineering and permitting services for the Arlington East Water Purification Facility, which will include design for membrane filtration, reverse osmosis, and UV advanced oxidation processes.
AvailableThe City of Houston Public Works seeks a Construction Manager‑at‑Risk (CMAR) for Project 2 of the East Water Purification Plant Enhancement to deliver facilities supporting a new Plant 4 that will expand finished water production by 360 MGD at the existing EWPP site. The solicitation is open, includes a pre‑proposal conference on January 20, 2026 and site visits on January 27‑28, 2026, and has a 10% M/WBE goal for the pre‑construction phase. Proposals are due March 26, 2026 at 10:00 AM CDT, with comprehensive design criteria and contract documents provided in the attachments.
Posted Date
-
Due Date
Mar 26, 2026
Close: Mar 26, 2026
The City of Houston Public Works seeks a Construction Manager‑at‑Risk (CMAR) for Project 2 of the East Water Purification Plant Enhancement to deliver facilities supporting a new Plant 4 that will expand finished water production by 360 MGD at the existing EWPP site. The solicitation is open, includes a pre‑proposal conference on January 20, 2026 and site visits on January 27‑28, 2026, and has a 10% M/WBE goal for the pre‑construction phase. Proposals are due March 26, 2026 at 10:00 AM CDT, with comprehensive design criteria and contract documents provided in the attachments.
AvailableConstruction of the Northeast Water Reclamation Facility Deep Injection Well Equipping and Conveyance Project.
Posted Date
Dec 29, 2025
Due Date
Feb 12, 2026
Release: Dec 29, 2025
Close: Feb 12, 2026
Construction of the Northeast Water Reclamation Facility Deep Injection Well Equipping and Conveyance Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →