Construction of trail. Work includes 66 LF of curb, concrete, remove; 562 LF of pipe, remove; 871 cy of excavation, common; 1,635 TON of compacted aggregate, no. 53; 77 TON of HMA for approaches, type b; 89 TON of HMA surface for patching; 1,437 LF of pipe, type 2, circular, diameter 12"; 312 LF of sign post, square, type 2, reinforced anchor base; 160 LF of line, multi-component, solid, yellow, 4"; 142 LF of transverse marking, multi-component, stop line, white, 24"; 400 LF of transverse marking, multi-component, crosswalk line, white, 24"; 100 LF of wayfinding sign post, type 2, unreinforced anchor base; 80 LF of wayfinding sign post, 6" X 6", unreinforced anchor base. See outside link.