Retrieving RFP details
Release
Close
City of Horicon
Upgrade to the wastewater treatment process including, but not limited to replacement of existing mechanical fine screen and washer compactor, replacement of influent wastewater pumps, demolition of existing aerated grit system, conversion of grit building to blower room with new aeration blowers, new concrete selector basins, conversion of oxidation ditch, new fine bubble diffusers, new concrete aerobic digester, new belt press sludge dewatering system, new treatment building, new UV disinfection system, new filtration system.
City of Seaford
WWTF generally consists of, but is not limited to, the construction/installation of: headworks structure and primary screening improvements, influent pumping station rehabilitation, a new grit removal / handling structure including flow splitter box and provisions for future secondary screening equipment, rehabilitation of both primary clarifiers, a new septage handling facility, electrical power, mechanical (hvac) and controls / scada improvements necessary to serve proposed improvement areas, necessary site work and stormwater management improvements, and sea level rise mitigation measures.
City of Newberry
Wastewater treatment facility (WWTF) expansion.
Jim Whelan Boardwalk Hall
Lighting controls upgrade.
Release
Oct 09, 2025
Close
Nov 06, 2025