Summary
Approx. 3,100 LF of 2" PE gas main and 58 residential gas service stub outs to serve the new Pine Level Estates Subdivision includes 3,100 LF install 2" PE gas main with tracer wire by open ditch or by horizontal directional boring, 1 EA tie into existing 2" PE gas main, 4 EA install 2" PE gas valve with valve riser, 18 EA Install Long Side service stub outs (each stub out svc will include an ESV and an endcap, and the end of each stub out will stop even with the water meter and 4ft off), 40 EA Install Short Side service stub outs. (each stub out svc will include an ESV and an endcap, and the end of each stub out will stop even with the water meter and 4ft off), 5 EA Install pipeline markers supplied by Owner, 5 EA Install tracer wire access points for
Locating purposes (locations will be determined in the field).