Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide design build services. Work includes well drilling, electrical, fiber installation, systems integration, fencing, landscaping, irrigation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Raleigh, North Carolina, is seeking qualified firms to provide construction services for the expansion of the DE Benton Water Treatment Plant. This project aims to enhance the plant's filtration capacity from 15 million gallons per day (MGD) to 20 MGD through the addition of two new biological aerated filters (BAF) and two dual-media filters.
Posted Date
Jan 8, 2026
Due Date
Feb 11, 2026
Release: Jan 8, 2026
Close: Feb 11, 2026
The City of Raleigh, North Carolina, is seeking qualified firms to provide construction services for the expansion of the DE Benton Water Treatment Plant. This project aims to enhance the plant's filtration capacity from 15 million gallons per day (MGD) to 20 MGD through the addition of two new biological aerated filters (BAF) and two dual-media filters.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes se wellfield expansion.
Posted Date
Dec 19, 2025
Due Date
Feb 3, 2026
Release: Dec 19, 2025
Close: Feb 3, 2026
Work includes se wellfield expansion.
AvailableProvide Southside Water Reclamation Facility Expansion to 9.0 MGD.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Provide Southside Water Reclamation Facility Expansion to 9.0 MGD.
Construction of a new 2.65 MGD PFAS WTP housing PFAS filter vessels at the Tyngsborough Wellfield WTP site. The new PFAS WTP building will be approx. 4,100 SF constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA; Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes; replacement of existing booster pumps, motors, VFDs, wiring, and associated piping work at
Posted Date
Jan 7, 2026
Due Date
Feb 19, 2026
Release: Jan 7, 2026
Close: Feb 19, 2026
Construction of a new 2.65 MGD PFAS WTP housing PFAS filter vessels at the Tyngsborough Wellfield WTP site. The new PFAS WTP building will be approx. 4,100 SF constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA; Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes; replacement of existing booster pumps, motors, VFDs, wiring, and associated piping work at
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →