Summary
Work includes, but is not limited to, pulverization of the existing pavement, pavement pulverization, shaping, and paving of the full roadway width (± 22) for approximately 1,793 LF. Additional work includes construction of a paved sidewalk, installation of concrete curb with scuppers, drainage improvements installation of approx 40 LF of 12" C900 DR-18; 245 LF of 18" Perforated corrugated polyethelene underdrain pipe, ADA ramps, permanent pavement markings, permanent signage, erosion & sediment control, traffic control, and all other work necessary to complete the project in accordance with the Contract Plans, Contract Provisions, and Standard Specifications.