2026 Well No. 12 Well House and Water Treatment Plant Modifications RFP
Posted
Aug 27, 2026
Sep 24, 2026
Constructing a well house and installing approx. , 800' of raw water transmission main to the existing water treatment facility. Work at the water treatment facility includes replacement of chemical feed systems, piping modifications, HVAC and lighting replacements, replacing the ballasted roof system, and painting. Work also includes relocating two generators from well no. 11 to the existing treatment facility and to an existing well house with new outdoor enclosures.